Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of them within an architect's control.

Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of them within an architect's control.

Martin Filler
Save QuoteView Quote
Save Quote
Similar Quotes by martin-filler

The most basic task of any museum must be the protection of works of cultural significance entrusted to its care for the edification and pleasure of future generations.

Martin Filler
Save QuoteView Quote

As with many other folk beliefs, 'feng-shui' undoubtedly incorporates some scientifically correct observation or received wisdom based on direct experience of natural phenomena; but it needs to be dealt with skeptically as a credible system of thought. Some feng-shui prescriptions can certainly lead to desirable results.

Martin Filler
Save QuoteView Quote

Masterpieces of art possess immense potential to advance a worldview that could help assuage the societal terrors posed by globalization, the most thoroughgoing socioeconomic upheaval since the Industrial Revolution, which has set off a pandemic of retrogressive nationalism, regional separatism, and religious extremism.

Martin Filler
Save QuoteView Quote

From the outset, MoMA followed the Bauhaus's strict prohibition against design that even hinted at the decorative, a prejudice that skewed the pioneering museum's view of Modernism for decades.

Martin Filler
Save QuoteView Quote

Any set of decisions about design is inevitably influenced by cultural prejudice, no matter how intent an architect might be to avoid it.

Martin Filler
Save QuoteView Quote

Always beware an unsigned architectural design.

Martin Filler
Save QuoteView Quote

Snohetta promotes a more democratic workplace atmosphere than most other architectural offices. This may merely reflect prevalent employment practices in Scandinavia, but Snohetta places a stronger emphasis on group participation in the design process than typical high-style firms.

Martin Filler
Save QuoteView Quote

Architecture was the last of the major professions to devise a formal 'cursus honorum' before its practice could be undertaken.

Martin Filler
Save QuoteView Quote

One of the stated goals of the postmodern movement in architecture was a greater sensitivity to the people who live in or use newly designed buildings.

Martin Filler
Save QuoteView Quote

Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of them within an architect's control.

Martin Filler
Save QuoteView Quote
Related Topics to martin-filler Quotes